Detaljer om förslaget

Svensk titel: Schakt och fyllning för anläggningsbyggande - Del 7: Hydraulisk deponering av utvinningsavfall
Nummer:prEN 16907-7
Källa:CEN
Kommitté:SIS/TK 539
Namn på kommittén:Schakt och fyllning för anläggningsbyggande
Publicerat:den 28 feb 2019
Sista svarsdatum:den 15 apr 2019
Contact email:kommentera(at)sis.se
Förslagets omfattning:

This document gives recommendations for the hydraulic placement of extractive wastes and may be applicable to the following:

— all stakeholders engaged in the deposition of mineral wastes using hydraulic placement techniques with respect to geotechnical and geochemical aspects of the investigation, engineering design, construction and operation of a mine waste facility and all subsequent monitoring activities;

— those extractive industries involving the production of fine particulate wastes which, in the course of industrial processing, require to be stored in a safe, stable and environmentally acceptable location;

— practitioners in non-extractive industries in fields where similar techniques may be applicable and for which no other European guidance exists.

The scope of this document includes all aspects of a dam, confining embankment or other structure serving to contain, retain, confine or otherwise support such wastes on surface in a terrestrial environment. The overall framework for the standard and for each stage of a hydraulic fill project is shown in Figure 3. This standard therefore addresses the characterization of the extractive waste for the purposes of hydraulic placement in the MWF both as part of the confining embankment and for safe storage and, in addition:

— specifies minimum requirements for the data to be acquired before the design and execution stage of a hydraulic fill project;

— provides guidelines for the selection of the type of confining embankment appropriate for the selected site;

— provides guidelines for the selection and characterization of the construction materials;

— establishes general principles on how to design and execute the hydraulic fill project from pre-deposition through operation to closure and rehabilitation;

— provides guidelines for monitoring and quality control of all stages of the hydraulic fill project to ensure long-term safety and stability.

This document considers how to store safely a given material resulting from a preceding process. It does not define, establish or specify detailed elements of the design of a hydraulic fill project but provides overall guidelines in order to comply with good regulatory and engineering practice. he document recognizes that similar techniques may be applicable to the hydraulic placement of materials in the non-extractive industries where no other European guidance exists, but notes that it is not applicable to landfill, dredging or the hydraulic filling aspects related to grouting.

Detta dokument föreslås att fastställas och publiceras som svensk standard.

För att lämna allmänna kommentarer på standardförslaget i sin helhet och på föreslagen titel – klicka på förslagets titel i innehållsförteckningen till vänster.

För att lämna specifika kommentarer på innehållet – skriv kommentaren och föreslagen ändring i rutan under avsnittet i fråga.

Standardförslag på engelska föreslås att fastställas som svensk standard utan översättning. Kommentarer på engelskspråkiga standardförslag bör vara på engelska.

För att ett standardförslag ska kunna fastställas som svensk standard måste det vara förenligt med svensk lagstiftning. Det är således viktigt att berörda svenska myndigheter klarlägger ifall standardförslaget är förenligt med svensk lagstiftning.